UP 5741 A Rebuilt C44ACM Leads A Manifest Train South As She Waits For A Train Crew  Contributor's Pick!       
Built April 2001 at GE Erie Locomotive Plant Erie, Pennsylvania and Rebuilt in June-July 2023 at Wabtec Fort Worth Locomotive Plant Texas
Date: 2/6/2024 Location: Bakersfield, CA   Map Show Bakersfield on a rail map Views: 110 Collection Of:   PAUL KEOGH
Author:  PAUL KEOGH
UP 5741 A Rebuilt C44ACM Leads A Manifest Train South As She Waits For A Train Crew
Picture Categories: Roster,Track,Action This picture is part of album:  UP 5741 Tied Down in The North Bakersfield California Siding
Share
User Comments
Name Type Comments Date
Josh Wagner General That is at Saco Siding 7/8/2024 6:30:13 PM

Add a Comment:  
Please Log in to leave a Comment.  
Link to this page: http://www.rrpicturearchives.net/showPicture.aspx?id=6285427